Commercial rough-in and tenant fit-out plumbing in Markham.

Taking a shell unit or a tired space in Markham and plumbing it for its new tenant: washrooms, break rooms, kitchens, utility sinks and equipment, roughed in from the drawings and finished to the fixture schedule.

Copper supply lines run in a commercial fit-out by Seal Plumbing

What does tenant fit-out plumbing include?

Everything from the existing building stubs to the finished fixtures: new washrooms and break rooms, kitchen and equipment hookups, water heaters, floor drains and the drain, vent and water lines that feed them. We rough it in from the drawings, pass the inspections and set the fixtures on the finish schedule.

A shell unit off Woodbine Avenue comes with capped stubs and a bare slab. A storefront on Main Street Unionville comes with a previous tenant's layout that no longer fits. Either way, Seal Plumbing takes the architectural and mechanical drawings, prices the fit-out within 24 to 48 hours and delivers the plumbing in two clean phases: rough-in before the walls close, finish once the millwork and flooring are in.

Rough-in includes any slab work for new floor drains or washroom groups, the drain, vent and water lines to each fixture, water heater and equipment connections and the shut-offs that let the tenant isolate their own unit. Finish includes fixtures, faucets, trim, equipment connections and the final test and inspection.

We coordinate directly with your general contractor and the landlord's base-building requirements, and we handle the permit and inspection sequence so the handover is not delayed.

Fit-out plumbing we deliver

  • Washroom groups & barrier-free washrooms
  • Break rooms, kitchenettes & commercial kitchens
  • Equipment hookups: dishwashers, ice machines, sterilizers
  • Water heaters & recirculation
  • Floor drains, hub drains & cleanouts
  • Tenant shut-offs & backflow prevention

How does commercial rough-in & tenant fit-out plumbing work in Markham?

Two phases, coordinated with the other trades, with inspections passed in between.

1

Quote from the drawings

Written, itemized quote within 24 to 48 hours of receiving the fit-out drawings.

2

Rough-in

Slab work if needed, then drain, vent and water lines to every fixture location, pressure tested and inspected before drywall.

3

Finish

Fixtures, trim, water heater and equipment connections set once millwork and flooring are complete.

4

Test and handover

Everything is run and tested, the final inspection is passed and the tenant gets a walkthrough of shut-offs and cleanouts.

Copper supply lines run in a commercial fit-out by Seal Plumbing
Copper supply in a commercial fit-out
Commercial toilet installed by Seal Plumbing
Commercial washroom fixtures set

What does commercial rough-in & tenant fit-out plumbing cost in Markham?

Tenant fit-out plumbing in Markham is quoted in writing from the drawings, within 24 to 48 hours. The price depends on the fixture count, how far the new fixtures are from the existing stubs, whether the slab has to be opened and the equipment the tenant brings.

Fixture countEach washroom group, kitchenette or kitchen adds drains, vents, supply and fixtures.
Distance from stubsNew fixtures far from the existing connections mean longer runs and possibly slab work.
EquipmentCommercial dishwashers, ice machines and specialty equipment need dedicated connections.

Commercial quotes are itemized by phase and submitted in writing within 24 to 48 hours of receiving the drawings. The written quote is the number that counts; changes to the drawings or scope are priced as change orders, also in writing.

What does a tenant fit-out in Markham need?

In Markham a new tenant usually means new fixtures, the landlord's base-building rules and often a fresh backflow survey.

New use, new survey

Markham's backflow by-law calls for a cross connection control survey whenever a property's use changes. A shell unit that becomes a cafe, a dental office or a lab is a typical case. We install the devices the survey asks for and leave them accessible for the annual test, so the new tenant opens compliant.

Mall and plaza units

Pacific Mall at Steeles Avenue and Kennedy Road is run as a condominium corporation with about 450 individual units, and CF Markville at Highway 7 and McCowan Road has more than 140 stores. Fit-outs in centres like these follow the landlord's base-building rules, which we read alongside the drawings.

Main street conversions

Turning an older storefront on Main Street Markham or Main Street Unionville into a new business often means washrooms where the old layout had none. We scan and cut the slab for the new drains, rough in the supply, pass the City's inspections and finish once the millwork is in.

For a Markham fit-out, send the drawings, the landlord's tenant criteria and your opening date. We quote within 24 to 48 hours, then split the work into rough-in and finish so it fits the general contractor's schedule. If the previous tenant's backflow device is still in place, we check whether it suits the new use.

Our Work

What does your recent commercial work look like?

Fit-outs and rough-ins from recent commercial projects. Tap a photo for a closer look.

See the full project gallery →

Which Markham areas do you serve?

Commercial and industrial units along Highway 7, Woodbine Avenue and Denison Street, the Main Street Unionville and Main Street Markham storefronts, and projects across Markham, Richmond Hill, Stouffville and the north GTA.

Highway 7Woodbine AvenueDenison StreetTorbay RoadSteeles AvenueKennedy RoadMcCowan RoadMain Street UnionvilleMain Street MarkhamMarkham Centre

Commercial work across the GTA: see the main commercial plumbing page or all service areas →

Residential job instead? See our Markham plumber page.

Commercial Rough-In & Tenant Fit-Out Plumbing nearby: Richmond Hill, Stouffville and Vaughan.

Commercial Rough-In & Tenant Fit-Out Plumbing questions Markham businesses ask

If the use of the property changes, yes. Markham's Backflow Prevention By-law 2012-27 requires a cross connection survey every five years or when the use changes. A retail unit becoming a restaurant or a clinic is a typical case. We install whatever devices the survey calls for.
Yes. We follow each centre's access hours, base-building rules and shut-down procedures, and coordinate with management before any water is turned off. Shared drains in a mall mean tie-ins are planned carefully, so neighbouring units are not affected while we work.
Yes. Most fit-outs run through a GC and we schedule our rough-in and finish phases around the other trades.
Yes. That usually means cutting the slab for the new drains, which we scan, cut and inspect as part of the job.
Yes. Owner-supplied fixtures and equipment are welcome; we confirm the rough-in matches the spec sheets before the finish phase.
We review them with the drawings and build the tenant isolation, backflow and metering connections the landlord requires.
Rough-in is usually days, not weeks, for a typical unit; the finish phase follows the millwork and flooring. The quote includes a phase schedule.

How do I get started?

Call 647-402-4825 or send your drawings through the contact page. Quotes on commercial work are submitted within 24 to 48 hours, in writing, from the mechanical and architectural drawings.