Home › Plumber in Markham › Commercial plumbing › Restaurant & Hospitality Plumbing
Hospitality · Markham, ON · Updated November 2026

Restaurant and hospitality plumbing in Markham.

Commercial kitchens, grease interceptors, floor drains, bar and dish areas and the washrooms your health inspection expects, roughed in from the drawings and finished to the equipment schedule. Licensed plumbers, quoted in 24 to 48 hours.

Vertical drain and vent risers in a commercial build-out by Seal Plumbing

What plumbing does a restaurant need?

A commercial kitchen needs hand sinks, prep sinks, a three-compartment sink, dish machine and equipment connections, floor drains and floor sinks under the line, a grease interceptor sized to the fixtures, a water heater that keeps up at service, and public and staff washrooms to code. We install all of it from the drawings and the equipment schedule.

Restaurants, cafés, bars and hotel food service in Markham have the most plumbing per square foot of any commercial use, and the health inspection depends on it being right. Seal Plumbing builds hospitality plumbing from the kitchen equipment schedule and the mechanical drawings, with a written quote within 24 to 48 hours.

Below the floor that usually means cutting the slab for floor drains, floor sinks and the grease interceptor, which our concrete scanning and slab cutting crew handles in the same quote. Above the floor it means indirect waste connections for ice machines and dish machines, hand sinks where the layout requires them, the bar sinks and glass washer, and a water heater sized for a full dining room.

We coordinate with the kitchen equipment supplier so every connection lands where the equipment needs it, and we handle the permit and plumbing inspections so the health unit and the building department are both satisfied before opening.

Hospitality plumbing we deliver

  • Commercial kitchen sinks: hand, prep & three-compartment
  • Grease interceptors sized to the fixtures
  • Floor drains & floor sinks under the line
  • Dish machine, ice machine & equipment connections
  • Bar sinks, glass washers & beverage lines
  • Public & staff washrooms to code

How does restaurant & hospitality plumbing work in Markham?

From the equipment schedule to the health inspection.

1

Quote from the drawings and equipment schedule

Itemized quote within 24 to 48 hours, with every piece of kitchen equipment accounted for.

2

Underground and interceptor

Slab cut for floor drains, floor sinks and the grease interceptor; underground inspection passed before patching.

3

Rough-in

Drain, vent and water lines to every sink, machine and washroom, tested and inspected before walls close.

4

Equipment connections and opening

Fixtures and equipment connected, system tested at service load, final inspection passed.

Vertical drain and vent risers in a commercial build-out by Seal Plumbing
Drain and vent risers
Underground drain trench in a commercial unit by Seal Plumbing
Floor drain trench cut

What does restaurant & hospitality plumbing cost in Markham?

Restaurant plumbing in Markham is quoted in writing from the drawings and the kitchen equipment schedule, within 24 to 48 hours. The price depends on the number of sinks and equipment connections, the grease interceptor size and location, how much slab has to be opened and the washroom count.

Equipment connectionsEvery sink, dish machine, ice machine and beverage line is a connection on the quote.
Grease interceptorSize and location, inside or outside, drive the underground work.
WashroomsPublic and staff washrooms are set by the occupant load and the code.

Commercial quotes are itemized by phase and submitted in writing within 24 to 48 hours of receiving the drawings. The written quote is the number that counts; changes to the drawings or scope are priced as change orders, also in writing.

What does a restaurant kitchen in Markham need from the plumbing?

Grease, equipment backflow and older main street buildings are what shape restaurant plumbing across Markham, from Unionville to Steeles.

Main street dining

Main Street Unionville had nine restaurants, three of them pubs, by 2006, and Main Street Markham runs through the city's original downtown. Kitchens going into older buildings on streets like these often need a new grease interceptor, floor sinks and washrooms brought up to current code before opening day.

Grease stays out of the sewer

A commercial kitchen sends grease toward the drain every service. A grease interceptor sized to the fixtures catches it before it reaches the City's sanitary sewer. We install the interceptor the engineer or municipality specifies, inside or outside the building, with cleanouts placed for easy pumping.

Every machine on the line

Dish machines, ice machines, beverage systems and chemical dispensers all connect to the water supply, and many need backflow protection under Markham's by-law. They also need indirect waste to a floor sink. We install both, matched to the kitchen equipment schedule and the supplier's rough-in sheets.

For a Markham restaurant, send the kitchen equipment schedule and the drawings. We quote within 24 to 48 hours, covering the interceptor, floor sinks, equipment connections and washrooms. In an existing building we camera the drain before quoting, so the new kitchen is not tied into a line that is already failing.

Our Work

What does your recent commercial work look like?

Commercial drainage, risers and fit-outs from recent projects. Tap a photo for a closer look.

See the full project gallery →

Which Markham areas do you serve?

Commercial and industrial units along Highway 7, Woodbine Avenue and Denison Street, the Main Street Unionville and Main Street Markham storefronts, and projects across Markham, Richmond Hill, Stouffville and the north GTA.

Highway 7Woodbine AvenueDenison StreetTorbay RoadSteeles AvenueKennedy RoadMcCowan RoadMain Street UnionvilleMain Street MarkhamMarkham Centre

Commercial work across the GTA: see the main commercial plumbing page or all service areas →

Residential job instead? See our Markham plumber page.

Restaurant & Hospitality Plumbing nearby: Richmond Hill, Stouffville and Vaughan.

Restaurant & Hospitality Plumbing questions Markham businesses ask

A commercial kitchen preparing food needs grease interception sized to its fixtures. We install the unit the engineer or the municipality specifies, and place cleanouts where they can be reached for regular pumping. Interceptor size depends on the fixture load, so the equipment schedule is the starting point.
Yes. Interior work does not need a heritage permit in Unionville's heritage conservation district, although exterior changes do. We phase the kitchen work around your service hours and keep the restaurant able to open between phases wherever the layout allows.
We install it to the size specified by the engineer or the municipality for the fixture load, inside or outside the building, with the cleanouts needed for pumping.
Yes. The equipment schedule and rough-in drawings tell us where every connection lands; we coordinate directly with the supplier.
They need indirect waste connections to a floor sink and dedicated supply, often filtered. We install both.
Yes. Public and staff washrooms are part of the same quote and the same inspections.
Yes, phased and scheduled for closed hours, with the slab work contained and the kitchen back in service between phases.

How do I get started?

Call 647-402-4825 or send your drawings through the contact page. Quotes on commercial work are submitted within 24 to 48 hours, in writing, from the mechanical and architectural drawings.