Home › Plumber in Markham › Commercial plumbing › Concrete Scanning & Slab Cutting
Below-Slab Plumbing · Markham, ON · Updated November 2026

Concrete scanning and slab cutting for plumbing in Markham.

Before a drain goes under a commercial floor, the slab is scanned for rebar, conduit and cables, then cut and chipped cleanly along the planned route. One crew, one quote, from scan to backfill.

Underground drain trench in a commercial unit by Seal Plumbing

Why scan the concrete before cutting a slab for plumbing?

Scanning shows what is inside the slab before the saw touches it: rebar, electrical conduit, post-tension cables and existing pipes. Cutting blind risks a severed service, a structural repair or an injury. Seal Plumbing scans first, marks the route, then cuts and chips only what the new drain needs.

Adding washrooms, a commercial kitchen or floor drains to an existing Markham unit usually means opening the slab. Older buildings on Main Street Markham and newer units along Woodbine Avenue hide different things in the concrete, so we scan every cut line before the saw starts and mark conduit, rebar and existing drains on the floor.

The cut follows the drain route from the mechanical drawings, with the trench sized for the pipe, the bedding and the slope. We chip out the concrete, excavate to the invert elevation, set the drains and have the underground inspection passed before backfill and the slab patch. See commercial drain, vent and water line installation for what goes into the trench.

Because the same crew scans, cuts and installs, there is no hand-off between a cutting contractor and the plumber, and the quote covers the whole sequence. Dust control and site protection are part of the job on occupied buildings.

Concrete work we handle for plumbing

  • GPR concrete scanning for rebar, conduit & cables
  • Layout and marking of the drain route
  • Slab cutting with dust control
  • Chipping, excavation & bedding
  • Underground drain installation & inspection
  • Backfill, compaction & slab patch

How does concrete scanning & slab cutting work in Markham?

Scan, mark, cut, install, inspect, patch. Each step is done before the next so nothing is cut twice.

1

Scan and mark

The slab is scanned along the planned route and any rebar, conduit, cables or existing pipes are marked on the floor.

2

Cut and chip

The slab is cut to the trench width with dust control, chipped out and excavated to the drain depth.

3

Install and inspect

Drains are set to slope on proper bedding and the underground inspection is passed before anything is covered.

4

Backfill and patch

The trench is backfilled and compacted and the slab is patched flush, ready for flooring.

Underground drain trench in a commercial unit by Seal Plumbing
Trench cut for underground drains
Commercial drain stacks installed by Seal Plumbing
Stacks set above the new drains

What does concrete scanning & slab cutting cost in Markham?

Concrete scanning and slab cutting in Markham is quoted in writing with the underground plumbing it serves, within 24 to 48 hours of receiving the drawings. The price depends on the length of trench, the slab thickness, what the scan finds in the way and the condition of the subgrade.

Trench length and depthLonger runs and deeper inverts mean more cutting, chipping and excavation.
Slab thicknessThicker or reinforced slabs take longer to cut and chip.
ObstructionsConduit, cables or existing drains in the route change the plan and the price.

Commercial quotes are itemized by phase and submitted in writing within 24 to 48 hours of receiving the drawings. The written quote is the number that counts; changes to the drawings or scope are priced as change orders, also in writing.

What is under the slab in a Markham commercial unit?

Every Markham building hides something different in its concrete, so the slab is scanned before any plumbing trench is cut.

Main street buildings

Main Street Markham was the city's original downtown, and Unionville's village core still has century buildings. Floors in older commercial buildings like these have often been patched and re-poured over the years. We scan before cutting and mark old drains, conduit and anything else lying in the path of the new trench.

Newer business units

Newer units can carry post-tension cables or heavy reinforcement, and cutting a tensioned cable is a structural problem, not a plumbing one. We scan every cut line with ground-penetrating radar. If the scan finds cables, the drain route is adjusted with the engineer before the saw ever touches the floor.

Heritage rules on main streets

Main Street Markham and Main Street Unionville sit inside heritage conservation districts, where exterior alterations need a heritage permit. Cutting a slab inside the unit is interior work. A new exterior vent or cleanout is not, so we point those out early and you can check with the City's heritage staff.

For slab work in a Markham unit, send us the floor plan, the planned drain route and any structural drawings you have. We scan, cut, chip, install the drain, book the underground inspection with the City and patch the floor under one quote. Cutting hours are set around your business and the tenants next door.

Our Work

What does your recent commercial work look like?

Underground drainage and commercial rough-ins from recent projects. Tap a photo for a closer look.

See the full project gallery →

Which Markham areas do you serve?

Commercial and industrial units along Highway 7, Woodbine Avenue and Denison Street, the Main Street Unionville and Main Street Markham storefronts, and projects across Markham, Richmond Hill, Stouffville and the north GTA.

Highway 7Woodbine AvenueDenison StreetTorbay RoadSteeles AvenueKennedy RoadMcCowan RoadMain Street UnionvilleMain Street MarkhamMarkham Centre

Commercial work across the GTA: see the main commercial plumbing page or all service areas →

Residential job instead? See our Markham plumber page.

Concrete Scanning & Slab Cutting nearby: Richmond Hill, Stouffville and Vaughan.

Concrete Scanning & Slab Cutting questions Markham businesses ask

Yes. We schedule the cutting for hours the landlord and neighbouring tenants accept, contain the dust, and protect finishes and stock around the work area. In busy centres like the plazas around Pacific Mall at Steeles and Kennedy, agreeing the timing with management first keeps the job moving.
Yes. The underground plumbing is inspected by the City of Markham before the trench is backfilled. We are on site for the inspection, correct anything the inspector notes, then backfill, compact and patch the slab flush so the flooring can go down over it.
Yes. We schedule the cutting for the hours you set, contain dust and protect the surrounding finishes and equipment.
We stop and reroute. Cutting a post-tension cable is a structural problem, so the drain route is adjusted with the engineer before any cutting.
Yes. The trench is backfilled, compacted and patched flush so flooring can go down over it.
Yes. The underground plumbing inspection is booked and passed before the trench is backfilled.
Both. The same crew scans, cuts, installs the drains and patches, under one quote.

How do I get started?

Call 647-402-4825 or send your drawings through the contact page. Quotes on commercial work are submitted within 24 to 48 hours, in writing, from the mechanical and architectural drawings.