Most questions about lead pipe replacement Toronto homeowners ask come back to one fact. Toronto splits the water service at the property line, so the City replaces its side and the homeowner replaces the private side, ideally at the same time to avoid a one sided cut. Once you know that, the rest is planning: what you have, who replaces which part, and how the work inside your basement fits around it.
If your house was built before the mid 1950s, the pipe that brings water in from the street may be lead. Renovation plumbing should be planned before walls and finishes lock in the layout, and a new bathroom or kitchen is a good moment to deal with an old service while the basement is already open.
One pipe, two owners
City guidance generally places the split at the property line, with the City owning the pipe from the watermain on the street to the property line and the homeowner owning the part from the property line into the home.
That split matters because replacing only one side leaves lead in service. City guidance notes that cutting the pipe to replace just one side can cause particles of lead to enter drinking water. The background is on the City's lead and drinking water page.
How to tell whether your pipe is lead
Start in the basement where the water line comes through the foundation wall, just before the meter. The City suggests that a pipe that is grey, scratches easily and does not sound hollow when tapped may be lead. Use a key for a light scratch and do not bend or file the pipe. If you are unsure, leave it for a licensed plumber to confirm.
A visual check only covers what you can see. The City side runs under the boulevard, out of sight. A plumber confirms the material at the entry and notes whether galvanized steel or older copper is mixed into the private side.
Planning the private side
Residents who commit to replacing their portion can apply to have the City replace its side. The steps are on the City's Priority Lead Water Service Replacement Program page.
On the private side, the work runs from the property line to the foundation. Depending on the route, that means an open trench or a trenchless pull, followed by a new entry through the foundation wall, a new main shutoff and a reconnection at the meter. Inside, the old line is removed or abandoned and the new service is supported and labelled.
The private side is the homeowner's cost, and the price varies with the length of the run, the route under driveways or landscaping, and how much basement finish is in the way. A fair quote comes after seeing the entry point and the route outside, not from a typical figure.
Size the new service for the house you will have
A replacement is the right time to ask whether the old service size still suits the house. A finished basement, a second bathroom or a secondary suite adds demand. The City generally will not run its low water pressure test on lead or galvanized steel pipes, which is one more reason to deal with an old service early. The City's low water pressure page explains its own checks.
While the work is being planned
Replacement follows the City's schedule once an application is approved. In the meantime, City guidance generally recommends cold water for drinking and cooking and a filter certified to remove lead. If water has sat in the pipes for a few hours, run the cold tap to flush the line before using it.
Older homes need careful rough in planning to tie new work into existing supply and drainage, and that is a big part of our Toronto work. Our Toronto plumbing page covers local work across the city.
Plumbing questions from GTA renovations
Whose responsibility is it to replace lead pipes?
Responsibility is split at the property line in Toronto. The City handles the pipe from the watermain to the property line, and the homeowner handles the pipe from the property line into the home. Coordinating both sides at the same time is the better plan.
How does the City of Toronto replace lead pipes?
The City's contractor typically digs one access pit at the watermain and one at the property line, then replaces the City portion between them. The contractor does not need to enter your home for that part, and the private side is arranged separately.
Code aware next step
Send a photo of the pipe at the meter, the age of the house if known, and whether you are already planning a renovation. We will tell you what the private side replacement would involve.